Selby, Johannesburg, Gauteng
Dr. Oetker is a global food manufacturer known for its pizzas, baking products, and desserts, with a South African production facility in Selby, Johannesburg. The factory operates sensitive, continuous production lines that cannot tolerate power interruptions. Persistent load-shedding and frequent local municipal grid outages were forcing the facility to run diesel generators at a cost of approximately R1 million per month — a significant and unpredictable drain on operating margins.
The Selby facility had severely limited space for additional infrastructure, ruling out conventional containerised energy storage. The solution had to be engineered in a top-and-bottom stacked configuration to fit within the available plant area — a technically complex arrangement requiring precise thermal management and structural design without compromising safety or accessibility.
SOCO ENERGY designed and installed a fully integrated 1.7MWh inline UPS solution, providing true seamless transfer during power outages with zero interruption to production. The system was engineered in a space-optimised top-and-bottom configuration and fully integrated with the facility's existing diesel generators, which now serve only as extended-duration backup rather than primary cover. The entire system was commissioned in 4 weeks.
In the first year of operation, Dr. Oetker saved R12 million — eliminating diesel consumption during load-shedding and protecting the production line from municipal outages. The system continues to shield the facility from grid instability, converting an unpredictable operational risk into a fully managed, reliable energy position.
SOCO ENERGY has delivered projects across every major commercial and industrial sector in South Africa. Let us show you what's possible for your operation.